Albion were tasked by our client to transform a dilapidated industrial unit on their site that was used for tyre storage into a welcoming area for their drivers to use after long trips.

Albion stripped out all the existing services and installed the following:

Works included:

  • New clad partitions to perimeter walls
  • New partitioning walls to create areas
  • New shower rooms
  • New male and female toilets
  • New suspended ceiling with insulation above throughout
  • New vinyl flooring throughout
  • New veneered doors
  • New Howdens kitchens
  • Decoration throughout
  • New PVC windows
  • New steel entrance door
  • Complete M&E Fit Out

The works took 6 weeks from start to completion.